ElectricalGeneral Electrical information:

  • Two hydro substations are located on site with 3 phase, 4 wire service, complete with FPE main disconnect switches located in the hydro substations having the following specifi cations:

  • 1150 East Substation: Two transformers at 2MVA, 27.6kv to 347/600v, 3 phase each
  • 1150 West Substation: Two transformers at 3MVA, 27.6kv to 347/600v, 3 phase each
  • Secondary voltages available in the building 347/600v, 3 phase and 120/208v, 3 phase
  • The power supply consists of two circuits from the Toronto Hydro Bemondsey Substation. The primary tie switch between the two circuits can be manually closed so to a certain extent, redundancy can be provided in case one circuit fails.